Expansion projects

Current projects:


Completed projects:

During the autumn of 2024, we carried out several different construction projects in our terminal building.
In short, the projects involved…

  • The front of the terminal building got a new panel and new windows.

  • The security and border control was rebuilt to meet new authority requirements.

  • The restaurant with the associated kitchen has been completely renovated. The new owner is the Momento Group, which will soon operate six restaurants in Jönköping. The new restaurant called Momento Airport opened on December 2, 2024!

Terminalens framsida har fått ny panel och fönster.

The front of the terminal has received a new panel and window.

The new restaurant Momento Airport. Photo: Momento Group

Southern operating area and New building B29 - summer 2020
To improve efficiency as well as to increase safety with vehicles moving around the airport, the entire operating area for vehicles and machinery has been relocated. The new site is along the southern part of the runway, while the old area is to be demolished and made room for, for example, new hangar buildings. A new fuel plant has been built on the new operating area, where we also prepared to be able to deliver biofuel to the airlines.

Drönarbild över Södra Driftområdet vecka 17 2020
Drönarbild över Södra Driftområdet vecka 21 2020 och den byggarbetsplats där ett stort garage för våra fältfordon ska ta plats
Drönarbild över Södra Driftområdet vecka 21 2020
Drönarbild över Södra Driftområdet vecka 18 2020
Garaget för våra fältfordon som byggts står nu färdigt.
Garaget för våra fältfordon är färdigt. Bild från vecka 46 2020

Turning zones lane 01/19 - autumn 2019
In order to be approved to handle larger flights than previously possible, it is required to be classified as a code 4E airport in accordance with EASA's (European Aviation Safety Agency) criteria. In the fall of 2019, we built turning zones at each end of the runway and widened the taxiway into the stands. We have therefore upgraded the airport to a 4E airport and can e.g. accommodate flights of the order of B767, B787 and A330.

Watch the film from the expansion project from 2019